eastboogie9279 eastboogie9279
  • 01-03-2018
  • Business
contestada

The fourth phase of the project life cycle involves ____ the project.

Respuesta :

MrsTriplet MrsTriplet
  • 11-03-2018
In project management there are four phases of the project life cycle. 
1) Initiation
2) Planning
3) Performing
4) Closing

The closing of the project involves finalizing all data collected, documenting and evaluating the project. This step is major in the phase because it is a reflection of the entire project and is usually turned into a superior.
Answer Link

Otras preguntas

List the perfect squares between 100 and 500 that are even numbers.
y varies directly as x. if x=5 when y=12 find x when y=30
Write an equation for a non-vertical line that contains the point ( 2,-4 )
how could you compare the energy carried in two different longitudinal waves
There is a turtle race. The race will last 2 minutes. I have to find the distance from the start each turtle will be at the end of the race. Speed (in inches pe
The decline in medieval trade was caused by
At a store , 24 bottles of water and 6 bags of chips costs $23.40. Five bottles of water and two bags of chips cost $6.60. What is the cost of a single bottle o
What is 9x^2-24x+ 16
2 friends want to equally share 4/3 feet of rope.What length of rope should ea friend get?
What is the property, transformation, or simplification used in each step of this problem?    x-7=34