carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

A bathtub can hold 66 galons of water. The faucet adds 5.5 gallons of water to the bathtub evvery minute. Find out how many minutes it takes to fill the empty b
Why did Gandhi most likely write this speech using a disapproving tone? A. He wanted to criticize the millions of poor that were not truly loyal to their count
CARPENTRY Laura wants to cut a board into three equal pieces. The board is 5/8 feet long. How long will each piece be?
what is the name of the helping molecule that aids an enzyme and it substrate get at the active site?​
which sample was an alkane​
The function of a verb in a sentence is to express state of being or
Draw the line of reflection that reflects ABC onto AA'B'C'. y 7 Pro 6- 5- Ted 4 B'3 B 2 N + -7 -6 -5 -4 -3 -2 2 3 5 6 7 СТ -2 C -3- Do 4 problems OOOO
mass of 12 helium atom​
how to test the pH level of a soap?​
Give a verbal description of how the patten for sequence 5,10,16,23 is growing​