L6ibYolacoGalatneym L6ibYolacoGalatneym
  • 04-03-2017
  • Social Studies
contestada

Span of control is less of a factor of concern for incidents that are resolved within the initial operational period. true or false.

Respuesta :

satyaannapurna7
satyaannapurna7 satyaannapurna7
  • 04-03-2017
it is true,the span of control is less of a factor of concern for incidents that are resolved with in the initial operational period.
Answer Link

Otras preguntas

working with c# i would like a messagebox.show prompt for yes/no and if yes prompt for inputbox.
Suppose that an investment of $13,000 grows in value at a rate of 9% per year. What is the growth factor for this investment? a. 0.09 c. 1.09 b. 1/9 d. 9
A person who is 1.5 meters tall casts a shadow that is 8 meters long. The distance along the ground from the person (N) to the flagpole (G) is 32 meters. Find t
Scientists plan to release a space probe that will enter the atmosphere of a gaseous planet. The temperature of the gaseous planet increases linearly with the h
WILL ASSIGN BRAINLIEST!!! The following is an incomplete paragraph proving that ∠WRS ≅ ∠VQT, given the information in the figure where segment UV is parallel to
if log65 = 1.812 what is the value of log(base 1000)65 ? 0.0604 0.604 0.1812 0.001812
give me the ans and steps thanks
dose anyone know this plz
what is the first step in solving the quadratic equation x2 = 9/16 ? take the square root of both sides of the equation. add 9/16 to both sides of the equation.
During the campaign of 1828 the Democratic Party changed by