brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

PLEASE HELP ILL GIVE BRAINLIESTWhat are two things that might cause you to have a different opinion about an issue than someone else?​
What do you think about the role of technology in teaching language skills?​
Square A'B'C'D' is the image of square ABCD under a dilation from center O¹ by scale factor r. Square A''B''C''D'' is the image of square A'B'C'D' under a dilat
john Quincy Adams Did Not Actively campaign for re-election because
Ken planted 10 flowers and 8 shrubs in his garden. He ran out of fertilizer before he finished and 3 flowers and 2 shrubs were planted without fertilizer. What
Graph f(x)=−|x+4|−3. Use the ray tool to graph the function.
the If the area of a square shape paper is 96.04 cm?, find its a side.​
2. A barrel floats down a river past two flags that are 100 meters apart. The time it took for the barrel to pass each flag is shown. What is the speed of the s
Expand the polynomial: ax(2x-3a)-x(ax+5a^2)
Solve the system of equation using substitution