rethabile4554 rethabile4554
  • 04-03-2022
  • Mathematics
contestada

5 men take 45hours to build a wall.how long will it take 9men working at the same wall?​

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

25 hours

Step-by-step explanation:

It takes 5 men 45 hours to build a wall.

So, if no. of men increases by 1.8 [∴ 5 x 1.8 = 9],

then time taken reduces by that same amount.

=> 45 hours / 1.8

=> 45 / (9/5)

=> 45 x 5 / 9

=> 5 x 5

=> 25 hours

Answer Link

Otras preguntas

What kind(s) of lava are most closely associated with composite cones?
Four cards are drawn from a standard deck. No cards are returned. a) Which is more likely: • Event A: drawing a straight (four consec
The equation of a circle is x2+y2+8x−14y+56=0 . What is the radius of the circle? r =   units
Estates-General What was its function? How often was it called to order? What year was it in effect?
Jarred says these number lines show 3/4 is equivalent to 2/3 is jarred correct?Explain
How much of the ocean is circulated by surface currents
Which investment is the riskiest, but has the potential to earn you the most money?
What was an accomplishment of Dinh Tien Hoang
Atoms of what two elements are in every organic compound? a. calcium and helium b. carbon and oxygen c. cobalt and hydrogen d. carbon and hydrogen
a quarterback threw a football 10 yards 2 feet and 1 inch. how many inches did the quarterback throw the football