jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

The sum of two numbers is 17. If one number is subtracted from the other ,their difference is -3. Find the numbers
mistlin is suing costumes for her grandchildren she is making three lion costumes and 1 Zebra costume and two bear costumes fabric cost 7.49 dollars per yard ho
MO bisects angle LMN , angle LMO = 6x-22 and angle NMO = 2x +34. Solve for x and find angle LMN.
find the value of the following indice​
Just question 1A and 2A with explanation please. Lots of point and brainliest!
A study found that a​ student's GPA,​ g, is related to the number of hours worked each​ week, h, by the equation g=-0.0007h^2+0.015h+3.03. Estimate the number o
put these in order starting with the smallest 6^2, 3^4, 2^5, 5^3
Simplify and solve it
please help with this
A telephone pole is 15 meters tall and a pigeon is standing on the ground 8 meters from the pole. If the pigeon flies from where it is standing to the top of th