medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What is the FNAF timeline
5. You survey the students in your class to find out what kinds of movies theylike to watch. The students were given the following choices: Comedy (C), Horror (
A brochure claims that the average maximum height a certain type of plant is 0.7 m. A gardener suspects that this estimate is not accurate locally due to soil c
Landscapes like the river delta above form through ____ in which sediment is transported from other locations to create landforms like this?
Anyone knows geometry??? The answer choices are A: 2 and 8 B: 1 and 4 C: 6 and 7 D: 5 and 8
Find the perimeter and area of a 30-60-90 right triangle with a hypotenuse of 8 m
Pluto has been reassigned and is now a dwarf planet. Why did scientists think this reassignment was necessary? If you were a scientist at that time, would you b
In the United states today what gives money it’s value
Find an example of a chronic condition on the Internet, and review the website of an organization that supports those with this condition. Explain how the condi
largest single organ; cleans out poisons in blood and takes vitamins out of the blood