adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

Which is an effective way to advocate for a cause?
Simplify (x - y + 1) - (x + y - 1).
Suppose that 17 inches of wire costs 51 cents at the same rate how much will 12 inches of wire cost
Which of these describes the triangle? Acute Right Equilateral Isosceles Scalene Obtuse
How to use a bar model?
A section in a stained glass window is shaped like a right triangle. The section has a height of 7.5 cm. If the area of the section of glass is 17.25 cm squar
This term refers to the mass movement of people, either by force or by their own free will. HELP ME!!!
A Train travels at a constant rate of 45 miles per hour. What is the distance,d,in miles,that the train travels in (t) hours ?
Explain the cellular functions that occur when antibiotics attack a bacteria cell.
A set of cards contains cards numbered 1 – 8. Mrs. Jacob’s class is conducting an experiment in which a card is drawn from the pile, the number is recorded, and